Is it possible to adjust the original cost of a fixed asset that was added from an invoice?
I added an asset from an invoice, and it was successfully added and prepared. However, the original cost shows as 0, which is incorrect. I want to adjust the cost to match the actual value. Is this possible? If not, what is the best solution?"
0