How does changeover rule work for item EFF
Summary:
Hello,
We have an item EFF called thickness, which corresponds to the thickness of the item and for items of different thicknesses, different resources are used. We have set up this EFF at item level, refreshed into production schedule, added this as an item attribute, and assigned this attribute to all the relevant resources.
When creating a change over rule, for example when an item is produced in 4inch thickness resource, and now it has to move to a 6inch thickness resource, it takes about an hour for the changeover. Now the item is assigned with EFF as 4inch as it is produced in 4inch first. When setting up changeover rules, i have chosen thickness as the attribute and from value is given as 4inch and to value has been given as 6inch. How does the system understand that this implies that when the operation moves frm 4inch resource to 6inch resource, the changeover