E920: R42520 subsystem from P4210 no asigning lots
Hi
When I setup subsytem processing R42520 and R42750 is running automatically OP 4 in Process Tab from P4210
sometimes It asigns lots and other not with the same item, lot, location, branch, AN8. If I turn off R42750 always asigns lots.
How Can I avoid this?
Regards,
Beatriz