migration
Hi,
I have sparc T7 with 4 ldom guests and i want to migrate to sparc T8-2.
I install control domain and create i/o service domain on sparc T8-2 and i zone in fc switch every disc from SAN that is zoned to sparc T7 to sparc T8-2.
Then i leave on control domain only the needed resources.
Then i live migrate every guest from sparc T7 to sparc T8-2.Is this ok?