Anyone Using PeopleSoft Test Framework for HCM PUM Updates/OE Testing?
Hi there! I was curious if anyone is using the PS test framework when you perform PUM upgrades, or for OE testing, or anytime you're making a change where a lot of testing needs to occur.
We have so many scenarios to test each time these events occur or when we make a sizable change to event rules and was curious if this functionality might be helpful for these instances. I currently have all test cases I've used in somewhat of a library but a lot of these test cases are long, with a lot of manual entry steps. Curious if this save us a little time with testing.