Hello,
I am using Advanced manufacturing, but I need to be able to track production by shift. How can I accomplish this?
You can only have one shop calendar per work center
I have 4 shifts, A,B,C and D.
I need to be able to view the data like this:
I have an end date from AM entry in this format: 10/21/2019 2:00:00 PM.
I would like to assign a shift to this date and time column.
If B shift is 12:00 PM to 6:00 PM, then the example above would be assigned B shift.