Plant Wise Material Requirement Planning (MRP) and each plant have multiple stores
We have 3 Manufacturing Plants (Plant 1, Plant 2 & Plant 3), within one plant there are multiple stores like RM, WIP & FG Stores and each store owner (owner ship of stock)/custodian is different person and i want to run Material Requirement Planning at plant level (Plant 1, Plant 2 & Plant 3). So how can we define org structure or location structure to achieve plant wise planning scenario (including all separate stores in MRP)
Expectations: Demand plan should consider stock of all stores within plant during demand calculation and generate supply plan
Plant 1: P1-RM, P1-WIP & P1-FG
Plant 2: P2-RM, P2-WIP & P2-FG
Plant 3: P3-RM, P3-WIP & P3-FG