Hello,
I have a work order that goes about 6 layers deep for subassemblies. They are not phantom assemblies. The operation tasks for the deepest layer has the same end time as the most top level work order. How do I get them interconnected so that operation tasks from subassembly ends at 4:30pm and the operation task for the parent work order starts at 4:30pm? Is this possible with the WIP & Routings module or does this require Advanced Manufacturing?