Standard Cost assembly with average cost components
HI There
I have a scenario where I have an assembly item: Shampoo,
The BOM for this has components:
Inventory item: Shampoo Bottle (average cost)
Inventory Item: labels (average cost)
Service charge: Manufacturing fee
I have a planned standard cost version ("Dec prices") with the costing method as average cost.
Would running a planned standard cost roll up result in the recalculation of the shampoo assembly item? (based on the average cost of its components?)
Would I need to select only the shampoo assembly or the individual components (shampoo bottle, labels)
Thanks