I am trying to have a BOM available to another subsidiary and when I check the 'include children' box and hit save I get the following error message
'These components are unavailable for use in the following subsidiaries: XXX'
In reviewing I have made all components of the BOM to be set with 'include children' have configured the location at the subsidiary and rolled the default cost.
The assembly has also been marked to include children for other subsidiaries, and the location and cost has been set there as well. The inventory revaluation transaction is correct.
If I look at the Costed Bill of Materials Inquiry screen all the components are listed correctly (but no unit cost).
What could be the issue and the next steps required to fix?
Thanks