What is the lowest level at which PPM Budgetary control can be estabished?
Summary:
Hi.
In the documentation it is mentioned that the possible segment at which control can be established is Project- Top Resource.
So that means we cannot apply a control at 'Task' level?
And Top- Resource means the highest level of RBS associated to the plan type? Eg: if RBS format is set as:
Exp Org- Exp Type- Supplier
, then control can only be established at the Exp Org and not at Exp Type: Am i correct?
Thanks
Atul