Can you load in the date of a historical candidate move via HDL?
Summary:
I don't think this is possible but want to just check. Can I add a date a candidate moved to a phase and state when I load their application.
Content (required):
I've tested moving candidates via HDL and the move date is the date of the load - is there anything else that can be done here?
Version (include the version you are using, if applicable):
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
0