Inventory control- Disposition functionality for Change Orders
Summary:
When an item is being replaced with another item (say Item A with Item B) in a ECO, how do we tell the system to make item B effective only when all Inventory for Item A is depleted? We need this control for supply chain operations where MRP can look for Supply and once item A inventory is zeroed out, Item B can be replaced.
Do we've such functionality in Cloud?
Can you pl. point me to the relevant sources for implementing this feature?
Content (required):
Version (include the version you are using, if applicable):
22D
Code Snippet (add any code snippets that support your topic, if applicable):