Unable to update Item description using import maps without a Change order
Summary:
Import maps mandatorily asking for a Change Order to update Item description even if its a new Item whic is not yet on a change order
Content (required):
Import maps are throwing below error:
Item Main Attributes can only be changed via Change order
while trying to update item description of an item which is a
- New item
- Not on any change order yet
- Is in Design Lifecycle
Even the Item user interface allows item description to be edited directly without a change order.
As per Oracle documentation, unless an item is on a Change order, item attributes can be modified.