can the approval rule routing based on a future assignment change
Summary:
Approval rule based on a future assignment change
Content (required):
We have quite a lot of future assignment changes due to a mass renewal of contract for the teachers in each of the school year.
For the contract renewal, it involves the update of assignment in a future date. The approval rule should be based on the future assignment details routing to the corresponding AoR or Line Manager set up in the future assignment.
Is there a way to setup the approval rule to pick up the corresponding AoR or Line Manager from the future assignment?