Immaterial changes for version lines (Period type)
Hi
I am trying to import a version line for a Period SMM obligation: Reduce Quantity from 8 to 4 (example: due to reducing number of subscriptions).
The system accepts the immaterial change, however the Quantity is not updated in the "Immaterial Revision Details", and allocation is done based on the Selling Amount and Extended SSP before the revision.
I would have expected the behaviour for Period SMM line would be similar to Quantity SMM line.
In this scenario I imported a version line for a Quantity type line, where I reduced the quantity from 4 to 2. The "Immaterial Revision Details" was updated accordingly: