Get Started with Redwood: Oracle Cloud SCM and Purchasing
Required a code in groovy so that if the first BR is running second BR should wait for the first BR
We are using the export and import method as we need to manipulate the file because of the mapping of dimension between two cubes.Data has been doubling when we are running for the parent and the child Entities at same time. Required a code in groovy so that if the first BR is running second BR should wait for the first BR to complete.
Tagged:
0