Is there any option to configure cost rate override at Project template level?
Summary:
Hello folks,
please let me know if there is any way to configure cost rate override at Project Template level.
            Tagged:
            
        
0  
            Summary:
Hello folks,
please let me know if there is any way to configure cost rate override at Project Template level.