Production Scheduling Changeover for every change of Batch Size

Summary:

Client has a requirement where there is a changeover required if batch size changes.

For example, for Item A, a workorder is being processed for batch size 2000. There is another workorder for the same item but with batch size 3000. In this case since the batch size is different, a changeover needs to apply. Is this feasible?

(Batch size is not fixed hence creating separate work definitions for each batch size is not feasible)

Content (please ensure you mask any confidential information):


Version (include the version you are using, if applicable):