How to track substituted items visually in Supply Planning Constraint?
Summary:
How can I track when a finished good is substituted by another item in Oracle Supply Planning, using a visual or report-based method?
Content (please ensure you mask any confidential information):
Hi everyone,
I’m working with a constrained supply plan in Oracle Supply Planning. I have a finished good (let's call it item A) that has a substitute item (item B), which is correctly configured in the item master. The substitution logic is working properly: item A has demand, and the plan is fulfilling that demand using available supply from item B.
Now, I’d like to know if there’s a way to track or visualize this substitution in the planning results. Ideally, planners should be able to see a table or report that clearly shows that item A was substituted by item B.