How to copy rate using pipeline?
Summary:
Error while executing pipeline to copy rates from P12 to P13
Following steps were followed to copy the rate from P12 to P13 using Pipeline:
- Create a copy rate profile
2. Created a pipeline and added the profile as a job to be executed
3. Executed the job and below is the error message from the log:
Could you please help us in resolving the issue? Let us know if we are doing something wrong.
Appreciate your help!
Tagged:
0