Update Requisition Preference Each PR Line
Summary:
Hi
We want to create PR line (in 1 PR number) to multiple location. Currently, we must update requisition preference. This is the organization structure:
Function | Loc | Org |
---|---|---|
Master Item Organization | A | A |
Inventory Organization | B | B |
Inventory Organization | C | C |
Inventory Organization | D | D |
FSM Default deliver to location | A | A |
Requisition Preference Default deliver to location | B | B |
Default ship to organization | B | B |
We cant choose organization in the PR line. When the default deliver to location in requisition preference is set to B and we choose Loc D in PR line, the ship to organization in the PO Line is B. This is because we are not update the requisition preference.