UI Staged Rollout Readiness vs Consistency - Legacy vs Redwood
Summary:
Redwood is being rolled out in pieces creating an experience dilemma. i.e. SSP - Requisition detailed page → viewing requisitions lines for which a PO has been created with the Redwood UI will link us to the Redwood PO UI despite us not being ready to use the new UI for POs.
We're concerned about the staged roll out. While it makes sense for consistency for all Redwood UI to link to Redwood UI - is there any option to have this link take us to the old UI rather than the Redwood PO UI if we hadn't rolled out Redwood for POs?