Why the materials column is zero when the extended Cost column is filled with a value
Summary:
The Materials column is zero and should have the value of the Material, and the Extended Cost column has a value which assumes that it is being considered for the rollup.
(See image)
Content (please ensure you mask any confidential information):
Version (include the version you are using, if applicable): 25B
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
0