Sourcing Rules and Capacity Constraints in Fusion Supply Planning for Multi-Org Fulfillment
Summary:
Hello Oracle Community,
I’m working with Oracle Fusion Supply Planning and have a scenario involving a make item (MPS planned) that needs to be fulfilled from two different organizations (Org A and Org B).
- The item has a consistent demand.
- I want the supply plan to first fulfill this demand from Org A, which has a daily capacity constraint (e.g., 24 hrs/day availability), and then have the remaining unmet demand fulfilled from Org B.
- Org A and Org B are both manufacturing sources for this component item.
My question is:
How can I model this correctly in the system using sourcing rules and assignment sets, such that the supply plan respects Org A’s capacity limit and routes the excess demand to Org B automatically?