In Rework WO, Negative WIP Material Issue receipt Cost Adj not reduce the FG item cost
Summary:
In Rework WO, Negative WIP Material Issue receipt Cost Adj not reduce the FG item cost
Content (please ensure you mask any confidential information):
- FG item with Actual cost Method cost Profile and Provisional Completion = Accumulate WO cost.
- The VU is at lot level which is a unique for each FG item or component item (Equipment ID = Lot Number)
- FG item placed in a Rework WO to replace one component with another.
- Removed a component with a Negative WIP Material Issue, and its VU record first Receipt Cost Layer with null cost because it is always a new record for each Lot\VU
Tagged:
0