Functionality discrepancy in Redwood Create/Edit offer screen for Proposed start date field
Summary:
Observation:
During testing of the Redwood create/edit offer page in ORC, we noticed a discrepancy in the "Proposed Start Date" field. Unlike the current RUI screens, this field does not default to the system date and also wipes the chosen date when trying to edit the offer
Expectation:
The "Proposed Start Date" field on the Redwood create/edit offer page should align with the existing functionality in the RUI screens, defaulting to the system date.
Article from feature release document states the below:
In Redwood, Visual Builder Studio defaulting rules will trigger to default the values in the targeted fields when the user visits the section during the create flow. If the user modifies the target field (on which BRF defaulting rule is written) and moves back and forth in the same create flow (without clicking the Save or Submit buttons), the user modified value will be retained. But if the user clicks Save and Close or Submit and revisits that section in a new create or edit flow, the defaulting rules will override the user modified value.