Handling Partial Pallet for Inspection During Receiving
During the receiving process, the inbound team receives full pallets, with each LPN representing a complete pallet. In certain cases, the team needs to extract a single carton from one of these pallets to initiate the inspection process.
Current Process:
- The inbound team receives the full pallet under a single LPN.
- To begin inspection, one carton is split from the original LPN and assigned to a new LPN.
- After completing the inspection process, the team needs to return the inspected stock either:
- Back into the original LPN, or
- At least into the same location where the original LPN (pallet) is stored.
Tagged:
0