Is it possible to set up Work Order Material Transactions for E-signatures using Deferred option?
Summary:
The business has already tested the Inline configuration of Work Order Material Transactions with E-signatures and E-records. However, this approach does not align with the current business process and therefore offers limited benefit. In this scenario, adopting the Deferred configuration may be more suitable, as it better integrates with the business flow for Work Order Material Transactions requiring E-signatures. Does Oracle support Deferred configuration of E-signatures for Work Order Material Transactions?
Content (please ensure you mask any confidential information):
Version (include the version you are using, if applicable):
25C (11.13.25.07.0)
Code Snippet (add any code snippets that support your topic, if applicable):