doubts about creation of parallel perimeter entity and consolidation flow
Summary:
Content (please ensure you mask any confidential information):
Hi all
When creating a parallel perimeter that includes the same company code, in this case Exxxx, since consolidation begins in July, the "Proportion" only uploads data from that period onward.
The accumulated data up to that point isn't uploaded, so the increase in both perimeters isn't the same, basically because of the consolidation is in "Periodic" mode.
The quickest way would be to consolidate from January if we want the full result, but we then need to "Recompute," which means we don't want to have to consolidate the main perimeter.
Tagged:
0