Cost Rollup with Different Overhead Absorption Types

edited 10:56AM in Costing 1 comment

Summary:

Hi Guru,

from below oracle document with examples for cost roll up with different overhead absorption types, why the 2% plant over head was not considering the raw material RS-A overhead and Fabrication Engineer resource overhead when calculating the cost for subassembly RS-AB, but later those two overheads were considered again for the assembly RS-ABCD? thanks in advance!

Example of Cost Rollup with Different Overhead Absorption Types


Content (please ensure you mask any confidential information):


Version (include the version you are using, if applicable):



Code Snippet (add any code snippets that support your topic, if applicable):

Howdy, Stranger!

Log In

To view full details, sign in.

Register

Don't have an account? Click here to get started!