Hi Guru,
from below oracle document with examples for cost roll up with different overhead absorption types, why the 2% plant over head was not considering the raw material RS-A overhead and Fabrication Engineer resource overhead when calculating the cost for subassembly RS-AB, but later those two overheads were considered again for the assembly RS-ABCD? thanks in advance!