Is there a way to trace allocation (pre and post) for a segment in EPCM
Summary:
I want to trace allocation for 1 cost center through different stages of allocation in EPCM. Is there a way to see it ? Example:
CC1 - allocation in : 100
this 100 is then allocated to CC2 and CC3 say 50 each through calculation run.
Is there a way to track the whole flow in EPCM ? Note that CC1, CC2 , CC3 are all in 1 dimension .
Content (please ensure you mask any confidential information):
Version (include the version you are using, if applicable):
25.10.76
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
0