Is there a way to trace allocation (pre and post) for a segment in EPCM

Summary:

I want to trace allocation for 1 cost center through different stages of allocation in EPCM. Is there a way to see it ? Example:

CC1 - allocation in : 100

this 100 is then allocated to CC2 and CC3 say 50 each through calculation run.

Is there a way to track the whole flow in EPCM ? Note that CC1, CC2 , CC3 are all in 1 dimension .

Content (please ensure you mask any confidential information):


Version (include the version you are using, if applicable):

25.10.76


Code Snippet (add any code snippets that support your topic, if applicable):