Multiple Material Cost Elements Rollup

edited 11:42AM in Costing 2 comments

We have a requirement where we want to break our Material Cost Elements in to 3 parts

Material

Paper Material

Ore Material

 

We can define the cost of a Finished Good manually and put required Cost here but in case of Rolling up the cost system is putting all the cost in to Matrial Cost Elament

 Is there a way to rollup components corresponding to seperate Material Cost Elements ?

Requirement Example: We have below Components part of Work Definition. An are raw materials.

AGRM100001 - Raw MAterial (Should rolled up under 'Material' Cost Element

AGRM1000207 - Ore Material (Raw MAterial) - Should get rolled up under 'Ore Material' Cost Element