The changed item component in the planned order is not available on the workorder
Summary:
Hello All,
We have a requirement to modify item components at the planned order level. The Make item has an item structure defined in PIM, which is referenced by the Planning module during plan generation. When the component is replaced from the Supplies and Demand page under the Item Structure section, the updated item structure is correctly reflected at the planning level. However, once the planned order is released and converted into a Work Order, the system considers the original component from the Manufacturing BOM, rather than the replaced component.
Case Scenario
Make Item: PP1345 Actual Component: PP1601 (derived from the Item Structure / BOM) Replaced Component: PP1602