How can we arrive the Work Order Quantity based upon Operation Yield - Oracle Manufacturing Cloud
Summary:
If the business start with Work Order Quantity as 100 and we defined the operation yield for first operation is 10%, 2nd operation as 20% then the system should provide WO output Qty as 72 considering operation yields(1st Operation Outcome - Ready Quantity as 90 (10% for 100 = 90) and Completed Quantity = 72 (20% for 90 = 72)). This could be achievable through Operation Yield functionality in Oracle Fusion, if not what could be the best option to achieve this solution.
Content (please ensure you mask any confidential information):
If the business start with Work Order Quantity as 100 and we defined the operation yield for first operation is 10%, 2nd operation as 20% then the system should provide WO output Qty as 72 considering operation yields(1st Operation Outcome - Ready Quantity as 90 (10% for 100 = 90) and Completed Quantity = 72 (20% for 90 = 72)). This could be achievable through Operation Yield functionality in Oracle Fusion, if not what could be the best option to achieve this solution.