FX Rate Integration Issue in FCC with Period 13 Enabled (December Mapping Conflict)
Summary:
During FX rate integration, the system is unable to pull exchange rates for Period 12 (December) because the mapped date (30-Dec) does not match the rate date available in ERP (31-Dec).
Content:
Hi Experts,
I am facing an issue with FX rate integration in FCC when Period 13 (Adjustment Period) is enabled, and I would appreciate your guidance.
- In FCC, Period 12 (December) is mapped to 30-Dec and Period 13 (December Adjustment) is mapped to 31-Dec (Since we can't duplicate period key)
- In ERP, the ending exchange rates are stored on 31-Dec
Issue - During FX rate integration, the system is unable to pull exchange rates for
Tagged:
0