Is Changeover rule setups same for Discrete and Flow manufacturing?
Summary:
Need a clarification regarding Flow Manufacturing in Oracle Production Scheduling.
Are Changeover Rules applicable for Flow Scheduled production lines?
Or for flow manufacturing, is changeover optimization handled only through:
- Flow Sequencing Rules
- Attribute Sequences
The documentation seems to indicate Changeover Rules apply only to equipment resources, while production lines use sequencing logic.
Can you please confirm the intended behavior?