How to Achieve Different Output Lot Costs in Oracle Fusion Manufacturing?
Summary:
We have a manufacturing process where a production work order consumes a combination of: Primary raw material & Scrap materials
Each Product lot produced can have a significantly different cost.
It appears that the work order accumulates all input costs into a single cost pool, resulting in the same unit cost being assigned across all output completions from the work order.
Our requirement is to understand whether Oracle Fusion supports:
i) Different output lot costs for the same finished item within a single work order.
ii) Lot-specific costing of finished goods.
Any standard approach to achieve this?
What are the common industry practices and Oracle-recommended approaches for achieving batch-level or lot-level cost visibility under Actual Costing?