Ability to Control Partial Receipt Allocation for Multiple Distribution PO Lines in Redwood
Summary:
In Oracle Fusion Classic Receiving, when partially receiving a PO line that has multiple distributions, the system allocates the received quantity sequentially. For example, it fully allocates to Distribution 1 first, then Distribution 2, and so on.
In Redwood Receiving, there is a Prorate option that distributes the partial receipt quantity across all distributions proportionally based on their distribution quantities.
My question is:
Does Redwood support both allocation methods (sequential allocation as in Classic and proportional allocation using Prorate), or is the Prorate method the only available option?