How can we replenish from a pallet location to reserve locations by first moving the pallet to a Dro
Summary: We are implementing min/max replenishment in Oracle WMS Cloud from a pallet storage location to reserve locations. The business wants a two-stage flow:
- The replenishment task moves the pallet to a Drop/Staging (STG) location first.
- At the Drop/STG location, the pallet is split into smaller LPNs based on the replenishment level (for example, a pallet of 100 split into boxes of 10).
- The split LPNs are then moved to their destination reserve locations.
We would like to know whether this can be done with standard replenishment configuration (replenishment template, rule, task creation template, task types and RF modules), or whether it needs an extension.
0