26D LCM: Landed Cost Estimation Advisor – charge breakdown limited to 3 charge lines per receipt

edited 8:47PM in Costing

Summary:

Landed Cost Estimation Advisor (26D): the GetLatestPOReceipts tool returns at most 3 charge lines per receipt, so the charge breakdown is understated when a receipt has more charge lines. The estimate returned by getReceiptLandedCostAverages also can't be reconciled with Item Landed Costs.

Content (please ensure you mask any confidential information):

Hi team,

I'm testing the seeded Landed Cost Estimation Advisor (agent ORA_RECEIPT_LANDED_COST_AVERAGES) in the Redwood Landed Cost workbench.

Scenario:
I have an item with 3 receipts (80, 50 and 100 Ea). Two of them have 4 charge lines each (Insurance, Allowance, Freight from Trade Operation A, and Freight from Trade Operation B). Item Landed Costs shows the correct landed cost per unit: 1.38 / 2.52 / 0.83.