An Absence Type controlling 2 Absence Plans simultaneously
Summary
Is it possible to create an absence type deducting to 2 absence plans at the same time?Content
We only want to use the absence type configuration without adding new fast formulas. The priority column does not allow inputting one number at the same time. Would the concurrent column work for this? If so, how?
Tagged:
3