Summary

How can I change the assigned date?

Content

Hi All!

I have enrolled a group in our system a new learning plan using the Learning Plan Mappings bulk loader. Unfortunately, I had the wrong assigned date and now the learning plan is showing up past due for these users. Is there a way to change the assigned date using bulk loader or some other method? I tried to upload the same report with the correct assigned date but the system skips the record. 

Update: figured out that you had to click on "Update Existing Recors" when re-uploading a new version of a bulk loader report. Totally missed that!