Test pod vs. Production pod

Content

P2T is copying production data onto the test pod.  Is there a process that we can sync the test pod to have the same process as production pod. So far we found these differences:

  • GL - Revaluation has different process results on a specific scenario. (This was found before Feb-2018 quarterly maintenance patch - will re-test to verify)
  • AP - Cancel Line in Invoices resulted in error in test pod, but production pod worked as expected.
  • BI Publisher - RTF report exports to Excel has no merged cells in test pod.  This was a new feature in release 12 upgrade, but this feature never applied in production pod. 