BOM Labor cost vs labor cost in WO

edited Nov 7, 2019 8:07PM in Costing 11 comments

Summary

Differnce between labor standar cost (routing) and Labor cost in WO

Content

The calculation of labor cost is totally different in Standard operations vs  what is reflected in WOs. 

For instance

Standard Operation:

Resource labor

Unist assigned 9 (employees)

Usage .00325

The standard cost of labor is 9 X .00325 = .02925 total time usage 9 employees

WO

1 x .00325 = .00325 time usage

WO reflects only 1.  Standar cost reflect the 9 operators cost

Why WO does not do the same  9 X .00325?????

 

 

Version

ERP Oracle fusion