BOM Labor cost vs labor cost in WO
Summary
Differnce between labor standar cost (routing) and Labor cost in WOContent
The calculation of labor cost is totally different in Standard operations vs what is reflected in WOs.
For instance
Standard Operation:
Resource labor
Unist assigned 9 (employees)
Usage .00325
The standard cost of labor is 9 X .00325 = .02925 total time usage 9 employees
WO
1 x .00325 = .00325 time usage
WO reflects only 1. Standar cost reflect the 9 operators cost
Why WO does not do the same 9 X .00325?????
Version
ERP Oracle fusion
Tagged: