Cost roll-up ending with error when the sub assembly is at actual cost

edited Dec 23, 2019 8:14AM in Costing 2 comments

Summary

Cost roll-up ending with error when the sub assembly is at actual cost

Content

Hi, we are having scenario where our product structure has 3 levels.

 

Top level Finished  items (with standard cost), Intermediate assemblies (at actual cost)  and base  ingredients (at actual cost).

 

As part of the testing we have done miscellaneous receipts  for all base  ingredients at a certain cost. After this we have created scenario  and performed  cost roll-up for intermediate assemblies, but this program is erroring out  with  

 

  1. “Standard cost for the item is missing for use in cost rollup”  and   
  2. “Items missing cost definition.”
  3. Assemblies not rolled up due to lower level error.