Cost roll-up ending with error when the sub assembly is at actual cost
Summary
Cost roll-up ending with error when the sub assembly is at actual costContent
Hi, we are having scenario where our product structure has 3 levels.
Top level Finished items (with standard cost), Intermediate assemblies (at actual cost) and base ingredients (at actual cost).
As part of the testing we have done miscellaneous receipts for all base ingredients at a certain cost. After this we have created scenario and performed cost roll-up for intermediate assemblies, but this program is erroring out with
- “Standard cost for the item is missing for use in cost rollup” and
- “Items missing cost definition.”
- Assemblies not rolled up due to lower level error.
Tagged: