Assign Schedule Parameters When Scheduling the Integration
Summary
Assign Schedule Parameters When Scheduling the IntegrationContent
Is there a way to assign values to the schedule parameters at the time of scheduling the integration?
E.g. The integration that runs in the morning should have schedule parameter set to 'M'
When the same integration runs in the evening the schedule parameter should be set to 'E'
Tagged:
2