How to change default load options in Data Integration screen?
Summary
When loading data Export mode should be replace instead of No Export; Period Dec-30Content
Hi,
when we click on Data Exchange, we get the Data Integration screen. When clicking the Run button, we get a popup screen (see attached). The Export Mode in that screen is on No Export. We want that on Replace. Both the Start en End periods are on Dec-30. We want that on the current period. How can we do that?
Best regards,
Joost
Version
20.06.82
Tagged:
0