Possible to retain OTBI/BIP report jobs upon P2T
Summary
Don't like having to reschedule the same report jobs after every P2TContent
As stated in Doc ID 2581724.1 "P2T refresh clears the scheduled information too. Hence, it requires to re-schedule all required jobs post P2T refresh." which in our case results in a hefty job since we have dozens of reports scheduled on test environment.
Hence looking for a way to retain report jobs upon P2T:
- Enhancement request (would even settle for pausing them in stead of purging them)
- Is there a way to extract (before P2T) and import (after P2T) report job schedules?
0