Work Order Components' Supply Types
Summary
Looking for detailed explanation about the why components are issued to a Work OrderContent
Hello all,
How does the Assembly Pull and Operation Pull work, as far as consuming the raw materials?
And how is it different from Push?
If, for example, I have 5 operations, and each consumes materials; if I choose Operation Pull for each operation, will the components' reporting be booked to WIP once I complete the Operation, as opposed to when I report the components' usage? and if I choose Assembly Pull does it means that the components won't be consumed from inventory to WIP once I complete one of the first 4 operations (excluding the last count-point one) but rather only after I complete the last operation of the Work Order?
Tagged:
1